Model | RE-1.2 | RE-2.0 | RE-3.0 | RE-4.0 |
Coil Material | δs≤230N/mm2,Cold-rolled Coil, Stainless Steel Coil, Galvanized Coil ,AL ,Copper | |||
Coil Thickness | 0.11~1.2mm | 0.2~2.0mm | 0.3~3.0mm 0.5-4.0mm | |
Coil Width | 300~800mm | 800~1250mm | 800~1250/1600mm 800~1600/1800mm | |
Coil Weight | ≤10T | ≤20T | ≤20T(25T) ≤25T(30T) | |
Coil I.D | ф508mm | ф508mm | ф508&ф610mm ф508& ф610mm | |
Coil O.D | ≤ф1800mm | ≤ф1800mm | ≤ф2000mm ≤ф2000mm | |
Cutting Range | 300~3000mm | 300~4000mm | 300~4000mm 300~4000mm | |
Cutting Accuracy | ±0.3mm | ±0.3mm | ±0.5mm ±0.5mm | |
Roller Diameter | ф65(50) | ф65(50) | Ф 85(65) Ф 100(80) | |
Linear Speed | 0~60m/min | 0~60m/min | 0~60m/min 0~60m/min | |
Control System | PLC Automatic control | PLC Automatic control | PLC Automatic control PLC Automatic control |
- Cutting accuracy and precision thanks to the machine solidity
- High quality on flatness
- High precise cut to length control
- High quality on cutting
- Perfect stacking
- High efficiency for production
- Delightful man-machine interface
- Easy and simpleness maintenance
1. What's your warranty?
Two years, during which all parts damaged because of the quality problem will be changed for free, but not include damage caused by natural disaster or inappropriate operation or human factor.
2. What's your delivery time?
Within 60 days after receiving prepaid. Some machines are in stock, so can be delivered at any time.
3. What are your payment terms?
30% deposit is paid before production, the balance should be paid after inspection confirmation and before shipment.
4. What's your install and training?
If buyers come to our factory to inspect, the training to install and operate is provided face to face.
If not, a manual and video are provided to show how to install and operate.
5. What's your after-sale service?
We provide 24-hour online service for our customers.
(1) The seller will test the machines freely in China, and the traffic expense in
China of the technique people will be paid by the seller. When our engineer goes to the buyer's place to test the machines, the buyer should pay the expense of accommodation, and traffic for the buyer's engineer.
(2) If the buyer sends people to receive the training of the operation given by the seller, during the training period, the seller should pay the expense of accommodation, and traffic for the buyer's engineer, as well as daily salary of USD 150.
6. How to place an order?
Inquiry---Confirm the profile drawings and price----confirm the PI---Arrange the deposit or L/C---Start design and production--- Test and inspection --- Pay the balance --- Arrange shipping